There are few vacancies available in Indonesia and only Indonesian need to apply. If you or your friends meet the requirement and available now please send your CV in MS WORDS to recruitment@deesideasia.com immediately.
The project require for E2E Optim in transmission side:
- TRS Equipment are Ericsson, NEC, SAGEM, Siemens, DMC and Nokia products
- RNC Equipment: RU10, RNC45, S-AXC, HiT, etc
- Sumatra area, Central Java, East Java, BalNus, Kalimantan and Sulampua
Scope: - TRS Equipment are Ericsson, NEC, SAGEM, Siemens, DMC and Nokia products
- RNC Equipment: RU10, RNC45, S-AXC, HiT, etc
- Sumatra area, Central Java, East Java, BalNus, Kalimantan and Sulampua
2G&3G TNP Optim Parameter and Troubleshooter with scope:
- Analyse daily worst link (a list which is submitted fr TNP Optim or even RF team) and trying to trace the source of problem
- Working very close to Netact-AXC, louncher, wbts mng.
- Coordination to OSS for any support and managing counter
- 3G Parameter InConsistensy checking ( COCO , AXC, SAXC and Tellabs) and DataDumb
- Close Discussion of Problematic link to related TNP Optim area
- CR coordination to Tsel if needed to change the parameter.
- Weekly customer Presentation
- Weekly Reporting, summary of action.
- Daily Monitoring issue and error on all graphical counter and all physical alarm including performance (ES,SES, UAS, SLIP) and capacity. Scope: Abis, Ater, Gblink, IuB, IuR-PS-CS and RNC (unit load and DSP) and submit a list to TNP Optim Parameter
- Close Discussion of problematic link to TRS Optim Parameter team
- 3G Parameter InConsistensy checking ( COCO , AXC, SAXC and Tellabs) and DataDumb
- Analyse problematic Pathlos Link Budget
- Weekly TRS Performance Report, Analysis and Recomendation
- Weekly Customer Presentation
Regards,
Harmony Ghani Ismail
Outsourcing Solutions
7.1B Menara Aik Hua,
Changkat Raja Chulan, 50200
Kuala Lumpur. Malaysia
Mobile: (+6) 012 2091084
Tel: (+6) 603 2031 5288
Fax: (+6) 603 2031 7468
www.deesideasia.com


